We would be responsible for designing, planning, and constructing the entire building. Here are some of the steps they might take:
- Design phase: The construction company would work with an architect and other specialists to create a design for the LOXERY Hotel that meets the owner’s requirements and any relevant building codes and regulations. The design would include the layout of the rooms and common areas, as well as the exterior façade and landscaping.
- Planning phase: Once the design is finalized, the construction company would develop a detailed plan for executing the project. This would include timelines for each phase of construction, budgets for materials and labor, and strategies for managing any potential risks or challenges that may arise during the build.
- Site preparation: Before construction can begin, the construction company would need to prepare the site by clearing any existing structures or obstacles, grading the land to ensure a level foundation, and installing any necessary infrastructure such as water and power lines.
- Foundation and structural work: The construction company would then lay the foundation for the hotel, typically using reinforced concrete or steel. They would also construct the load-bearing walls, floors, and roof to create a sturdy and safe structure.
- Interior and exterior finishing: Once the basic structure is in place, the construction company would focus on the interior and exterior finishes. This could include installing plumbing and electrical systems, finishing the walls and ceilings with drywall or other materials, installing flooring and lighting, and adding decorative elements such as artwork or furniture.
- Landscaping and site work: Finally, the construction company would complete any landscaping or site work necessary to make the LOXERY Hotel a welcoming and attractive destination for guests. This could include planting trees and shrubs, installing outdoor seating areas, and creating pathways and parking lots.
Throughout each phase of construction, the construction company would need to ensure that the work is being done safely, efficiently, and in accordance with all relevant regulations and codes. They would also need to communicate regularly with the owner of the LOXERY Hotel to ensure that their needs and preferences are being met, and that the project is progressing according to schedule and budget